ST-03Tunnels, Pilchowice Zapora – Wleń

Three bores in six kilometres, and the reason the middle section of the line took until 1909 to open.

Record

TypeTunnels (three)
LineLN-02 — Jelenia Góra – Żagań
Builtto 1909
DesignerPrussian State Railways engineering office
Principal dimension320 m (longest)
Spans—
StatusOut of regular service
Fig. — tunnel portal, schematic section. Not to scale.

The three bores

Between Pilchowice Zapora and Wleń the line passes through the Czyżyk tunnel (187 m), the Dwory Mountain tunnel (154 m) and the Zamkowa Mountain tunnel (320 m). The last is the longest on the route.

The section opened on 28 August 1909, four years after the sections either side of it. The tunnelling accounts for essentially all of that delay.

Why here

The valley below Pilchowice is a gorge with no continuous shelf on either bank. A surface alignment would have required either an impossible number of retaining structures or a detour long enough to defeat the purpose of the line. Three short bores were the cheaper answer, and short bores at this date were well within routine practice.

Condition

The portals are masonry-lined and in fair condition where they can be seen. Vegetation has closed in on the approaches since regular traffic ended. The bores should be treated as unsafe and are not open.

An independent inventory of railway engineering structures in Silesia. Compiled from published sources and site visits. Not connected with any infrastructure manager, operator, museum or public authority.

Figures are quoted as published and are not independently surveyed. Access notes describe conditions observed on a particular day and must not be relied on for planning. Several structures listed here are disused and unsafe.

Text CC BY 4.0 · References · About · Sitemap