ST-02Pilchowice bridge

A single steel truss 43 m above the Bóbr, built with the dam it was meant to serve, and now carrying no scheduled traffic at all.

Record

TypeSteel truss bridge
LineLN-02 — Jelenia Góra – Żagań
Built1905–1906
DesignerPrussian State Railways engineering office
Principal dimension131.7 m span
Spans1 main span
StatusOut of regular service
Fig. — steel truss span over valley, schematic elevation. Not to scale.

The structure

The bridge is a steel truss with a main span of 131.7 m, standing 43 m above the water. It was built in 1905–1906 as part of the Jelenia Góra – Pilchowice section, which opened on 1 October 1906. It is among the highest railway bridges in Poland.

Context

The bridge cannot be understood apart from the Pilchowice dam. The railway was pushed through this valley to supply the dam works, and the bridge is the single most expensive consequence of that decision. The water it crosses is itself a product of the dam.

Condition

Regular passenger service on the line was suspended in December 2016. The structure remains standing and has been the subject of periodic proposals for reuse, tourist operation and film work. None of that constitutes maintenance.

Anyone visiting should treat the deck as inaccessible and plan to view from the shore. The approach paths are steep and unmade.

An independent inventory of railway engineering structures in Silesia. Compiled from published sources and site visits. Not connected with any infrastructure manager, operator, museum or public authority.

Figures are quoted as published and are not independently surveyed. Access notes describe conditions observed on a particular day and must not be relied on for planning. Several structures listed here are disused and unsafe.